First 3D printed commercial building
Quem
Dubai Future Foundation
Resultado
first first
Onde
Emirados Árabes Unidos (Dubai)
Quando

The first 3D printed commercial building was achieved by Dubai Future Foundation (UAE), in Dubai, UAE on 20 February 2020.


A 3D-printer measuring 20 feet high, 120 feet long and 40 feet wide was used to print the building. The entire structure was printed using a giant cement printer, then assembled on site. Printing took 17 days and was installed on in 2 days.